Content Page: 15 Construction In Cold Weather
-
Construction In Cold Weather
—
No masonry construction shall take place when the temperature at the site of work is below- a) 2 degrees Celsius at a time when the temperature is rising; or b) 5 degrees Celsius at a time when the temperature is falling.