      • I. Chapter 8: Lighting

        Alcoves in daylighted rooms 5Increase in area of required daylight openings. Table V
        Areas of required daylight openings Interpretation of term 1
        increase in Table VLighting on stairs and in passages 11
        minimum permissible areas of required daylight
        openings
        Table INatural Lighting alcoves in daylighted rooms 5
        Artificial Lighting
        augmentation of natural lighting
        10areas of required daylight openings 4
        Instead of natural lighting 9artificial lighting instead of 9
        Daylight openings 4Lighting requirements for non-habitable rooms 8
        Areas of required depth of room permitted for
        various areas of
        Table IIMaximum depth of daylighted rooms 6
        minimum permissible areasTable IOpen space outside required daylight openings 7
        position of required daylight openings 3
        minimum permissible areas depth of open
        air measurement opposite required.
        Table IIIrequired daylight openings. 2
        Open space outside required 7Non-habitable rooms lighting requirements. 8
        position of required 3Passages lighting in 11
        required 5Stairways lighting on 11
        Daylight roomsStandard service illuminance table schedule
        alcoves in 5
        maximum depth of 6
        Daylight space in relation to height of building
        minimum plan dimensions Table IV
        Depth of daylight rooms maximum 6
        Floor lighting 12
        Illuminance table of standard service schedule

        1. Interpretation of Terms.

        In this Chapter—

        “Habitable room” means any room design for human occupation, but excluding bathrooms, water-closets, stairways, passageways, lift-cars, photographic dark rooms, sculleries, domestic laundries, cold rooms or garages used for parking alone.

        2.Required Daylight Openings.

        (1) Subject to the provisions of Part II, in all buildings, every habitable room (except shops conducting, every habitable room (except) shops conducting retail business, restaurants, tea-rooms, storerooms, cinemas, theatres, bars and kitchenettes having a floor area of less than 5 square meters), shall be provided with openings for the direct admittance of daylight.

        (2) Such openings as make up the area required by section 4 are hereinafter referred to as “required daylight openings”.

        3.Position of Required Daylight Openings.

        Only openings or portions of openings which are situated above the level of 300 millimeters above the floor of a room shall be included in the area of required daylight openings.

        4. Areas of Required Daylight Openings.

        (1) General requirements. —Subject to the provisions of this section, required daylight openings in any room shall have a total area admitting daylight, that is excluding the frame-members in accordance with the requirements of Table I

        Table I
        Minimum permissible areas of required daylight openings.
        12
        Type of habitable room Minimum permissible area of
        required daylight openings in a room
        expressed as a percentage of the floor
        area of that room.
        Kitchen 12
        workshop or workroom 15
        All other habitable rooms 10

        (2) Required daylight openings under projections. – If a required daylight opening is overhung by an open veranda, balcony, eaves or other projection so that the projection cuts a line drawn from any refence-point, positioned as described in subsection (4), away from the building in a plane at right-angles to the plane of the wall containing the opening, and at 4 degrees to the horizontal, then the required area of the daylight opening shall be increased by 1 per centum of the floor area of such room for every 300 millimeters of projection of such veranda, balcony, eaves or other projection beyond such line.

        (3) Where a projection, as described in subsection (2), projects over an opening so as to cut a line drawn from any reference point (positioned as set out in subsection (4) ) away from the building in a plane at right-angles to the plane of the wall containing the opening, and at 30 degrees to the horizontal, that opening shall not be considered a required daylight opening:

        Provided that, where there shall be additional natural or artificial sources of light to the satisfaction of the local authority, the provisions of this subsection may be relaxed by the local authority..

        (4) Any reference-point referred to in subsection (2) or (3) shall be in the plane of the daylight opening concerned, and within the width of such opening, and at a height of the sill of such opening, or 300 millimeters above the floor-level of the room served by such opening, whichever is the higher level.

        5. Alcoves in Daylight Rooms.

        (1) In a room having required daylight openings, the sum of the floor areas of alcoves and the like, which are not directly visible from at least one required daylight opening, shall not exceed 10 per centum of the total floor area of the room.

        (2) Portions of screens and partitions which are glazed with clear white glass from a height of 1 metre above the floor-level to the top of the screen or partition shall not be regarded as restricting visibility.

        6. Maximum Depth of Daylight Rooms.

        No part of a room having daylight openings shall be farther from the plane of such an opening than the distance measured perpendicular to that plane, set out in Table II for the area of daylight openings provided in the room.

        Table II
        Depth Of Room Permitted for Various Areas of Daylight Openings
        12
        Area of provided daylight
        openings in the room expressed as
        a percentage of the floor area of
        that room.
        Maximum permissible distance from a daylight
        opening expressed in multiples of H
        102,0
        152,5
        203,0
        253,5
        • For intermediate values of daylight opening areas, the corresponding maximum permissible distance shall be found by linear interpolation.
          ** H is the height above floor-level of the head of the daylight opening concerned.

        7. Open Space Outside required daylight openings1.

        (1)space outside required day-light openings shall comply with the provisions of this section.

        (2) Where a daylight opening faces directly towards a permanently unobstructed open space within the stand on which the building is located, or a street, or a public place, or any combination of these which totals more than 4,5 meters in width, the height of the building above the sill of the daylight opening concerned shall not exceed that show in Table III, for the “depth-of-open-air-measurement” opposite the daylight opening.

        TABLE III
        MINIMUM PERMISSIBLE DEPTH-OF-OPEN-AIR-MEASUREMENT OPPOSITE REQUIRED DAYLIGHT OPENINGS
        12
        Maximum permissible height of building
        above sill concerned in
        meters
        Depth of air
        measurement opposite required
        daylight opening in meters.
        64,5
        95,4
        127,2
        159,0
        1810,8
        2112,6
        2414,4
        2716,2
        3018,0
        3621,6
        4225,2
        4828,8
        6036,0

        *For intermediate values of permissible height of building, the minimum depth-of-open-air-measurement shall be found by linear interpolation

        (3) The “depth-of-open-air-measurement” required in subsection (2) shall be the distance measured in a horizontal plane, at the level of the sill of required daylight opening concerned, and at right-angles to the plane of the wall-face containing such opening, from the farther boundary of open space, street or public place described in that subsection, to the face of the wall containing the opening:

        Provided that, where a cornice, balcony or similar projection from the building containing such opening extends over such line of measurement by a distance greater than 500 millimeters, the measurement shall be made to a vertical line drawn through the edge of the widest overhanging projection.

        1The requirements of section 7 do not necessarily ensure adequate open space about buildings. This may be controlled by the town planning scheme in force in the area of jurisdiction of the local authority, and such requirements must, if necessary, be amended, to avoid conflict with the town planning scheme.

        (4) Where a required daylight opening does not face such open space, street or public place as described in subsection (2), it shall face an unobstructed open space, termed a “required daylight space” which complies with the following requirements—

        a) it shall cover an unobstructed plan area in the space of a rectangle or parallelogram with dimensions D and W, as described in paragraphs (c) and (d), not less than the dimensions set out in Table IV;

        b) the plan area of the required daylight space shall be measured beyond the boundary of an adjoining stand, or beyond the centre-line of an adjoining street or public place;

        c) the dimension W (the width) of the plan area shall be measured always parallel to the face of the wall containing the daylight opening, and shall, wherever measured, always be bisected by the line of measurement of dimension D, as illustrated in the Figure;

        d) the dimension D (the depth) of the plan area shall be measured from the mid-point of the sill of the daylight opening and at an angle β to the plane of the wall containing such opening, the angle β being not less than 30 degrees, as illustrated in the Figure;

        e) the required daylight space shall be measured clear of any obstructions projecting from the surrounding walls at levels above that of the sill of the daylight opening, unless such projecting obstructions are less than 500 millimeters in width, in which case such obstructions may be disregarded.

        (5) If the required daylight space is a parallelogram in plan, the minimum area admitting light of the daylight opening shall be increased above that set out in Table I by the percentages set out in Table V corresponding to the value of the angle β

        TABLE IV
        MINIMUM PLAN DIMENSIONS OF REQUIRED DAYLIGHT SPACE IN RELATION TO HEIGHT OF BUILDING

        123
        Height of building Minimum permissible
        measurement D in meters
        Minimum permissible measurement
        W in meters
        61,81,85
        92,72,00
        123,62,15
        154,52,30
        185,42,45
        216,32,60
        247,22,75
        278,12,90
        309,03,05
        3610,83,35
        4212,63,65
        4814,43,95
        6018,04,55

        *For intermediate heights, the values of D and W shall be found by linear interpolation

        (6) Where the height of the building from the sill of the daylight opening is referred to in subsection (2) and in Tables III and IV, such height shall be measured as the vertical distance from the level of the sill at the daylight opening concerned to the eaves or the top of the parapet, or, where this does not apply, and in the case of stepped buildings, to such other positions as the local authority may consider to be the top of the building containing the daylight opening.

        REQUIRED DAYLIGHT SPACES

        TABLE V
        INCREASE IN AREA OF REQUIRED DAYLIGHT OPENINGS IN TERMS OF SECTION 7 (5)

        12
        AnglePercentage by which area required by
        section 4 must be increased.
        30100
        3290
        3480
        3671
        3863
        4056
        4542
        5031
        5523
        6016
        6511
        707
        75 5
        802
        Above 80Nil


        *where β, as measure, is intermediate to the values given in this Table, the appropriate percentage increase in area of required daylight opening shall be obtained by linear interpolation.

        8. Lighting Requirements for Non-Habitable Rooms.

        Those rooms specifically excluded from the requirements of section 2, and also all non-habitable rooms, shall be provided with means of artificial lighting to the satisfaction of the local authority, or, failing such provision, shall comply with the requirements of section 2 relating to the daylighting of habitable rooms.

        9. Artificial Lighting Instead of Natural Lighting.

        The local authority may permit artificial lighting to be used instead of natural lighting in rooms or buildings, taking into account the function of such rooms or buildings.

        10. Augmentation of Natural Lighting by Artificial Lighting.

        The local authority may require artificial lighting to be provided to augment natural lighting in any case where, in spite of compliance with the provisions of this Chapter, the natural lighting in a room is, in the opinion of the local authority, inadequate.2

        2For the guidance of local authorities, a table of standard service illuminance recommended by the illuminating Engineering Society of London, Great Britain, is set out in the Schedule, and is not to be constructed as part of the provisions of this Chapter. The Schedule is not fully comprehensive of all requirements.

        11. Lighting on Stairways and in Passages.

        (1) Every owner of a building which contains a stairway or passage designed to be used by more than one tenant shall install and maintain a lighting system capable of producing illumination at any one point of not less than 50 lux on all such stairways or passages

        (2) Lights on landings and on other parts of such a stairway and in a passage shall be kept on through-out the hours of darkness, or a any time when the illumination would otherwise fall below 50 lux, or switches shall be provided and so arranged that the light may be switched on above or below each flight of stairs or at either end of the passage.

        (3) Where passageways and stairways are only artificially lit they shall be provided with emergency lighting of not less than 20lux at floor level.

        12. Floor-Lights.

        Floor-Lights of glass or other translucent and brittle material shall not be allowed in floors between the storeys of a building, unless they and their supporting frames are able to sustain the design floor-load and to comply with any other requirements of these by-laws, relating amongst others to fire protection.

        13. Application of Chapter 11.

        Lighting arrangements must also comply with the provisions of Chapter 11

        For the guidance of local authorities, a table of standard. service illuminance recommended by the Illuminating Engineer- ing Society of London, Great Britain, is set out in the Schedule, and is not to be construed as part of the provisions of this Chapter. The Schedule is not fully comprehensive of all requirements.

        SCHEDULE
        (for guidance only)
        TABLE OF STANDARD SERVICE ILLUMINANCE
        (Taken from the Illuminating Engineering Society of London, Great Britain, for various locations and occupations: I.E.S. Code 1973)
        Standard service illuminance
        lux
        Position of Measurement Limiting Glare Index Color Appearance of Light Source
        A. LOCATIONS
        Hospitals- Laboratories500Bench 19Intermediate or warm
        Operating theatres- General 400Trolley Height Intermediate
        Tables.special lighting
        Wards- Bedheads
        General30-50PillowIntermediate or warm
        Reading150Book Plane Intermediate or warm
        Circulation space150Bed Height Intermediate or warm
        Office buildings- General office500Desk 19Intermediate or warm
        Executive office500Desk 16Intermediate or warm
        Conference-rooms750Tables 16Intermediate or warm
        Drawing offices Drawing boards750Board 16Cool Intermediate or warm
        Reference tables.500Table 16 Cool Intermediate or warm
        Libraries-
        Shelves, book stacks
        150Vertical at floor 19Intermediate or warm
        Reading tables.300Table 19Intermediate or warm
        Closed bookstores100Vertical at floor 19Intermediate or warm
        Book-binding500Desk 19Intermediate or warm
        Cataloguing, sorting500Desk 19Intermediate or warm
        Public halls
        Auditoria-
        Multi-purpose500Horizontal at seat level Intermediate or warm
        Foyers75 SCALARS1,2 meters above floor 19Intermediate or warm
        Schools Gymnasia300Floor Intermediate or warm
        Art rooms500Easel 19Cool or Intermediate
        Kitchens- General500Working surface 22Intermediate or warm
        Food stores150Floor Intermediate or warm
        Dining-rooms300Tables 22Intermediate or warm

        The average illuminance over the whole surface of a very small sphere located at a given point.

        Standard Service
        illuminance lux
        Remarks
        B. OCCUPATIONS
        Rough work.
        Routine work
        Demanding work Fine work
        Very fine work
        Minute work.
        300 to 500.
        500 to 750
        750 to 1,000
        1 000 to 1500
        1 500 to 3000 3 000
        Rough machining and assembling
        Offices, control rooms, medium machining and assembling Drawing or business machine offices, inspection of medium machining Color discrimination, textile processing, fine machining and assembly Hand engraving, inspection of fine machining or assembly.
        Inspection of very fine assembly.

        Note. For detailed tables, see the 1.E,S. Code 1973, of the Illuminating Engineering Society of London, Great Britain.