(1) All copies of site-plans of alterations and additions to existing works shall be prepared using the following fixed colours and forms of representation-
a) areas of proposed work, red;
b) work to be demolished, uncoloured and out-lined with black dotted lines;
c) new private sewers, brown;
(2) Working-drawings of alterations and additions to existing works shall be prepared using the following fixed colours and forms of representation-
a) new brick and masonry, red;
b) new concrete, green;
c) new iron or steel, blue;
d) new wood, yellow;
e) all other new materials, to be clearly indicated and to be described in words;
f) work to be demolished, uncoloured and out-lined with black dotted lines.
(3) Sewerage and drainage plans of alterations and additions to existing works shall be prepared using the following fixed colours and forms of presentation-
a) new sewers and new soil-pipes, brown;
b) new waste-pipes and new private sewers carrying trade effluent, orange;
c) new waste-pipes and new waste-sewers, green;
d) new vent-pipes to all types of pipes, red;
e) new private drains, blue.